Water treatment for the Geomar

GEOMAR Helmholtz Center for Ocean Research Kiel, ALMA FIL

Task The GEOMAR Helmholtz Center for Ocean Research Kiel is one of the leading institutions in global marine research. It researches the diverse processes of the ocean from the deep sea to the atmosphere, focusing on physical, chemical, biological and geological aspects. GEOMAR's research areas include: Ocean Circulation and Climate Dynamics, Marine Biogeochemistry,

Read more

Paper mill, Poland, ALMA BHU LHPS

Task Treatment of river water for a leading global manufacturer of pulp based on recycled fibers, paper, corrugated board and corrugated cardboard. Design data Waste water volume: 800 m³/h Target parameters: Use as process water for production and as cleaning water. Solution & implementation For efficient removal of dissolved phosphorus and nitrogen compounds as well as undissolved particulate matter

Read more
ALMA MODULE with flotation

Schultheis Weiher, Offenbach, ALMA NeoDAF HDED

Task The Schultheis pond in Offenbach has shown clear signs of eutrophication since 2005 due to an increase in the phosphorus concentration in the water. This has led to increased growth of blue-green algae and an impairment of the ecological balance. As a countermeasure, the city of Offenbach planned the construction of a water treatment plant. Our responsibility lay in

Read more
Reverse osmosis system customized on a rack

Calvatis GmbH, Germany, ALMA OSMO Process

Task Calvatis GmbH is a leading global manufacturer of cleaning agents and disinfectants and also specializes in developing tailor-made hygiene concepts for its customers. With production and sales locations on a global scale, the head office and research and development department are based in Ladenburg, Germany. We were given the task

Read more
River water treatment for Südzucker AG in Wanze, Belgium.

Südzucker AG, Belgium, ALMA BHU BiosS-Treat

Task Treatment of river water for further use as cooling water, process water and boiler feed water in drinking water quality. Design data Treatment volume: 2 x 275 m³/h river water treatment 4 x 82 m³/h process water treatment 2 x 28 m³/h boiler feed water Target parameters: Drinking water quality Solution & implementation For obtaining process water, boiler feed water and cooling water of drinking water quality from river water

Read more
River water treatment plant for cooling water and boiler feed water

Aquatech, USA, ALMA BHU LHPS

Task Treatment of river water for further use as cooling water, process water and boiler feed water with softening and silica removal. Design data Treatment volume: 295 m³/h 1 x 1300 gpm Clarification Target parameters: Softening and silica removal Suitable for process water Solution & implementation We successfully use our ALMA BHU LHPS process to extract process water from river water.

Read more
Drinking water treatment system with ALMA BHU LHPS and the ALMA BHU MMF

Sotravic Ltée, Mauritius, ALMA BHU LHPS

Task Treatment of surface water from various sources to produce water for feeding into the drinking water network. Adjustment of the pH value using milk of lime. Design data Treatment volume: 3,333 m³/h Target parameters: Parameters for feeding into the public drinking water network Solution & implementation To obtain purified water for the drinking water network, a

Read more
References in river water treatment

BUDIMEX S.A., Poland, ALMA BHU LHPS

Task Treatment of river water from the Wisla for the production of process water. Design data Wastewater volume: 3 x 1,400 m³/h Target parameters: Suitable for process water Solution & implementation We use the innovative ALMA BHU LHPS process to efficiently remove dissolved phosphorus and nitrogen compounds as well as undissolved particulate matter from river water. This approach

Read more
Reverse osmosis with biological pre-treatment

Südzucker AG, Zeitz, ALMA BHU BiosS-Treat

Task Treatment of river water from the White Elster for the production of process water. Design data Wastewater volume: max. 220 m³/h Target parameters: Suitable for process water Solution & implementation In order to efficiently produce the required amount of process water, the river water first undergoes a comprehensive purification process in our advanced ALMA BHU LHPS reactor plant (more on the

Read more