Task

Construction of a municipal wastewater treatment plant with precipitation, flocculation and sedimentation (BHU reactor LHPS), biological treatment with nitrification and denitrification (ALMA BHU BAF) and ozonization (ALMA BHU OXI), including commissioning.

Design data

Preparation quantity:

  • Daily wastewater volume: 12,000 m³/d

Target parameters:

  • Treated wastewater for discharge into surface waters

Solution & implementation

In the first process step, dissolved substances are converted into undissolved substances by neutralization precipitation in our ALMA BHU LHPS and separated using high-performance lamella separators. The remaining biological compounds are degraded by microorganisms in the ALMA BHU BAF process. The ALMA BHU BAF process is operated in 2 stages and includes nitrification and denitrification.

In the final process step, trace substances and persistent substances are oxidized and rendered harmless by means of ozone(ALMA BHU OXI).

 

References municipal wastewater treatment

Client Gaungda Water Management
Commissioning 2016
Location Xinyi,
People's Republic of China
Process Precipitation/flocculation,
biological treatment,
ozonation
product ALMA BHU LHPS,
ALMA BHU BAF,
ALMA BHU OXI

Similar projects

Anaerobic digestion for the production of biogas from municipal sewage sludge

Biogas plant for Keszthely sewage treatment plant, Hungary, ALMA BHU GMR

Construction of a biogas plant for the sludge utilization of a municipal sewage treatment plant with an energy production of 2,000 kWh/d in Hungary.

Municipal wastewater treatment plant in winter

Focsani wastewater treatment plant, Romania, wastewater treatment and biogas plant

Turnkey construction of a municipal wastewater treatment plant with biogas plant as sludge treatment for a total wastewater volume of 40,000 m³/d in Romania.

Round basin for sedimentation and sludge tank of a municipal sewage treatment plant

Alba lulia wastewater treatment plant, Romania, wastewater treatment and biogas plant

Construction of a municipal wastewater treatment plant with biological phosphorus elimination and a biogas plant for a total wastewater volume of 21,562 m³/d in Romania.

Nitrification and denitrification in a municipal wastewater treatment plant

Velenje municipal utilities, Slovenia, ALMA BHU BAF, BIO

Expansion of a municipal wastewater treatment plant with reduction of nitrogen and phosphorus compounds and biofiltration for a total wastewater volume of 18,000 m³/d in Slovenia.

Plant overview of a municipal wastewater treatment plant in Romania.

SC AQUABIS S.A, Romania, biological phosphorus elimination, denitrification

Expansion of four municipal wastewater treatment plants for a total wastewater volume of 1,440 m³/h with a focus on nitrogen and phosphorus degradation using biological processes in Romania.

Aerated grit chamber for pre-treatment of municipal wastewater

Tecuci wastewater treatment plant, Romania, pre-treatment, biological treatment, post-treatment, sludge treatment

A municipal wastewater treatment plant for a wastewater volume of 14,177 m³/d with mechanical pre-treatment, biological treatment, post-treatment and sludge treatment in Romania.

Get in touch with us