Our latest blog posts

February 14, 2026. 9:00 AM
Water reuse in industry – challenges, risks, and success factors for stable and economical systems
Water reuse in industry is much more than just a "membrane project." Fluctuating inflow conditions are crucial for stable, economical plants, as they increase the risk of scaling and biofouling. The article shows why robust pre-treatment with buffering, solids and grease separation, and controlled nutrient balance is the key to success, and which technologies and design principles have proven themselves in practice.

January 31, 2026. 3:19 PM
Update: Installation of the river water treatment plant despite winter conditions
The installation of the Krählwerke and high-performance lamella separators in the ALMA BHU LHPS system is proceeding according to plan despite winter conditions. The 5,000 m³/h river water treatment plant is also on schedule, thanks to strong local partners and continuous installation monitoring by our engineers.

January 18, 2026. 8:43 a.m.
Successful commissioning: Cooling tower blowdown water recycling plant for EEW in Germany
One of the first cooling tower blowdown water recycling plants for a thermal power plant in Germany. Together with EEW, we are setting new standards in industrial water reuse.